Solar system

Doueir (Nabatieh): In Arabic (الدّوير) is a village in the Nabatieh District of the South governorate in Lebanon. Inhabitance: The village is inhabited with 15000 Lebanese citizens and 2000 Syrian refugees.

Potable water sources: Doueir is connected to the water network of South Lebanon Water Establishment (SLWE). SLWE operates and maintains the pumping station, reservoir, and network distributing water to the village and adjacent areas.

Doueir Al wadi PS includes a deep well supplied with a submersible pump, a break tank and submersible booster, a station building including pump’s control panel, a stand by generator and a bulk fuel tank, and a pole mounted power transformer substation dedicated to pumping station.

ComponentBrand / ModelKey SpecificationQuantity
System TypeHybrid SolarHigh-Capacity 100 kWp Three-Phase1
InvertersDEYE50 kW Three-Phase Hybrid (SUN-50KSG01HP3-EU)2
PV PanelsJINKO Tiger Pro555 W monocrystalline196
Total ArrayN/A108.78 kWp1
BatteryPylonTech PowercubeM3A-180 Lithium-ion Rack (68.2 kWh usable)1
MountingN/AHot-dip galvanized steel (120 km/h wind rated)1
SwitchingN/AAutomatic Transfer Switch (ATS)1
CablingN/A6 mm² DC and 4 $\times$ 120 mm² AC copper
GroundingN/ATriangular grounding system1